Three to six months out: set the plan
The earlier you start, the more control you have. Work backwards from the date you must be out of your current premises.
- Fix a moving date and check lease end dates at both buildings.
- Appoint a move lead internally, with authority to make decisions.
- Get the new floor plan and decide where each team, desk and machine will go.
- Audit what you have. List furniture, equipment and files that will move, be replaced or be disposed of.
- Book a survey. A free survey lets your removals team see access, lifts, stairs and parking at both ends.
A clear written plan, shared with everyone involved, prevents most of the problems that cause delays later.
Keep staff, clients and suppliers informed
People work better when they know what is happening and what is expected of them. Tell your team early and update them regularly.
- Explain the date, what will change and how each person's work will be affected.
- Ask staff to clear their desks and pack personal items by a set day.
- Give everyone a simple labelling system so their things arrive at the right desk.
Outside the business, tell clients, suppliers, your bank, insurers and HMRC about the new address. Update your website, email signatures, Google Business Profile and printed stationery in time for the move.
Plan IT and phones first
IT is usually the part of an office move with the longest lead time. Book broadband and phone lines at the new premises early, as installation can take weeks.
- Back up all data before anything is disconnected.
- Photograph cabling at each workstation so it can be rebuilt quickly.
- Label every item of IT equipment with its destination desk.
- Decide who disconnects and reconnects servers, printers and networks. Usually this is your IT provider, not the removals crew.
Your removals team will pack and move equipment carefully, but your IT support should test that everything works before staff arrive.
Move in stages to keep trading
If your business cannot close, a staged move lets part of the team keep working while the rest relocates.
- Move less time-critical departments and archive files first.
- Schedule the busiest stages for your quietest trading days.
- Keep essential services, such as phones and customer-facing staff, running until the final stage.
Storage can help here too. Surplus furniture, archive boxes or stock can go into storage while you settle in, rather than cluttering the new space.
Packing, furniture and confidential files
Office contents need a different approach to a house move. Desks and storage units may need dismantling, and some files cannot be left unattended.
- Use strong, uniform boxes that stack well and label them by floor, room and desk number.
- Keep confidential and personal data files sealed and under supervision.
- Ask your removals company to dismantle and reassemble furniture, so it goes back together properly. 1st Choice offers this as an optional extra, charged on top of your quote.
- Protect the new building as well as the old one. Our crews use heavy-duty floor sheeting and padding on doors and frames.
Our full-time, uniformed crews handle business moves themselves, with no agency staff. See business removals for more, or our packing services if you want us to pack for you.
Access, parking and building rules
Office buildings often have rules that a house does not. Check them at both ends well before the move, as they can decide when and how the move happens.
- Loading bays and lifts. Ask building management whether you need to book the goods lift or loading bay, and for how long.
- Parking. Town centre streets in Bournemouth and Poole may need a parking suspension or permit for the lorry. Ask the council early.
- Moving hours. Some shared buildings only allow moves at certain times.
- Protection requirements. Landlords may ask for floors, lifts and walls to be protected.
Share these details at your survey so the crew size, vehicle and timings are planned around them.
After the move: check before day one
Once everything is in, test it before your team arrives, so they can start work without delays.
- Internet, phones, printers and security systems are working.
- Power and lighting are on at every desk.
- Keys, fobs and alarm codes have been issued.
- Signage, post redirection and deliveries point to the new address.
Walk round the old premises one last time for anything left behind, and take meter readings at both buildings. For a real example, read our office relocation in Poole.